The work was carried out for Forest Way School which is a specialist school based in Leicestershire. The work we carried out was the preparation to create an exciting playground for children with Autism.
We used the Kubota U27-4 with the Engcon Tiltrotator for the exacavations, allowing us to be excavate hard to reach areas from a single point of movement, this saved a lot of time as some hard to reach areas would have otherwise been hand dug.
We were contacted by Forest Way School to prepare an unused and unsafe space, into an area that could be transformed into a playground.
Forest Way School were open to ideas for the best way to retain the soil, LDW Group opted for a Gabion Retaining wall, filled with granite supplied from the local quarry, to in keep with the school’s surroundings and local town.
We began by excavating and removing excess soil creating a level area to work from. We then removed the unsafe RSJ’s and sleepers and replaced them with new RSJ’s and concrete panels along the right-hand side. We installed Gabion Baskets along the front and left hand side of the playground plot. Using recycled materials, we raised the ground level by 2.5m, heavily compacting every 200mm to ensure maximum ground support.
The area was finished with flat top edging kerbs and heavily compacted MOT type 1, ready for the playground to be installed by Playforce, part of i’d verde and fencing to be installed by Charnwood fencing.